The stupa at Sacha Kutir in Denmark.
UPDATE: September 27, 2006
Stupa Inauguration 2007: Website updates on the Danish site
We always start and finish all work on the stupa by singing three mantras: 9 Gayatri, 3 Prabhu Aapa Jago and 7 Medicine Buddha. |
|
 |
 |
The outer wall of the platform foundation is completed. |
|
Cement was poured on top of the foundation.
A ceremony was held with Arati, singing and playing drums to celebrate its completion.
 |
Four shelves are being formed where several hundred Medicine Buddha statues will stand. |
|
Lots of Medicine Buddha statues were made during the summer camp. |
|
 |
 |
Laying the outer edge of the Sacha mandala has just begun. |
|
The four gateways of the Sacha mandala are beginning to take shape. |
|
 |
 |
Twelve niches for storing various relics are being constructed. |
|
The twelve niches close to completion. |
|
 |
 |
Some bricks must first be cut to size to fit into the structure. |
|
Construction work of the nine lotus leaves is underway. |
|
 |
 |
The tiles for the mosaic floor are broken into suitable sizes. |
|
Pondering upon the work procedure for laying the mosaic floor design. |
|
 |
 |
Work has begun on the mosaic floor down at the bottom of the stupa, three meters underground. |
|
Swirling out from the center are four spirals with colors for each of the four corners of the world. |
|
 |
 |
The oak tree pole is being worked on and will hold the crystal and will support the copper tubing. |
|
The crystal will be placed in a hollow near the base while the four copper tubing will lay in grooves coiling up around the pole.
Previous Update on the Stupa & more information here.
|